Rivian Adds 18 New Locations to Its Adventure Network Map

Rivian just gave its Adventure Network a solid boost, updating the map with a fresh batch of upcoming charging sites across the U.S. Shoutout to RANTracker for catching this update and keeping the community in the loop.

These new sites are currently in different phases—some are just entering planning, others are deep in permitting or already under construction. Here’s the full list of what’s coming:

  • West Melbourne, FL
  • Tallahassee, FL
  • Asheville, NC
  • Nags Head, NC
  • Tysons, VA
  • King of Prussia, PA
  • Tinton Falls, NJ (First location in New Jersey)
  • West Hartford, CT (First location in Connecticut)
  • Brewer, ME
  • Waco, TX
  • Oklahoma City, OK (First location in Oklahoma)
  • Maple Grove, MN (First location in Minnesota)
  • Albuquerque, NM (First location in New Mexico)
  • Gallup, NM (First location in New Mexico)
  • Park City, UT (First location in Utah)
  • Wickenburg, AZ
  • Pismo Beach, CA
  • Tumalo, OR
April 2025 Rivian Adventure Network Sites Coming Soon
April 2025 – Rivian Adventure Network Sites Coming Soon

Before this update, the Rivian Adventure Network was sitting at 108 operational sites—and that number keeps ticking up. On top of that, Rivian’s also rolling out upgrades to existing stations with their new V1.5 chargers. These allow any CCS-equipped EV to charge, not just Rivians, which makes the network a lot more versatile and community-friendly.

10 Comments

  1. Just a clarification that Brewer, Maine is not the first location in Maine. There are actually two other RAN sites in Maine already, Freeport and Kittery.

  2. Heck yesssss this is fantastic news! I’ll be able to utilize 2 of the new locations when they come online!

  3. Finally! Some love for the upper Midwest and Minnesota! I hope it’s the start of many more – soon.

  4. Happy to see RAN in Gallup. EA chargers at Walmart often unavailable or just not working.

Leave a Reply

Your email address will not be published. Required fields are marked *